MSBA Randolph Public Schools

 
  • Randolph, MA

    Massachusetts School Building Authority

    August 2016

  • Multiple projects through the Massachusetts School Building Authority Accelerated Repair Program at Randolph schools:

    • John F. Kennedy Elementary School Window Replacement

    • Middle School Boiler Replacement

    • High School Window and Door Replacement

    • High School Roof Replacement

    Proposals to renovate, improve, and/or replace:

    • Lyons Elementary School

  • The Town of Randolph, one of the most diverse communities in Massachusetts, has a population of 3,000 students in eight schools. Projects at four Randolph schools improve building efficiency, resiliency, and utility consumption, as part of a multi-year contract with MSBA including eight studies for Massachusetts public schools. All projects consider International Energy Conservation Code (IECC) and Massachusetts School Building Authority standards for design and replacement of building envelope components.

    Through cost control and effective construction administration, Taylor & Burns was able to save the Town of Randolph over $1,000,000 to allocate for additional building improvements.

  • Randolph High School becomes accessible with a new entrance ramp, of cast-in-place concrete with metal guardrails and handrails.

    • New windows and doors are compliant with IECC

Previous
Previous

Iron Horse Park Operations Control Center

Next
Next

Mass Maritime Academy Power Plant + Resiliency